Work in Progress

Please do not dump leaves and debris in the ditches as it causes drainage tiles to stop up and roads to flood when it rains.

Blount County covers 567 square miles and has approximately 833 miles of roads. Given our current budget, we were able to pave 13.34 miles so far this year.

​Please be aware and use caution when approaching our mowing crews. We have six side mount bush hog mowers and three long arm mowers, we mow every road in the county based on routes five times each on both sides with a triple cut which works out to be almost 25,000 miles of road per season and if you stretch it out it is the equilavent to driving from Maryville to San Fransico and back on a mower 5 times, please be patient as it takes time to complete this process.

jgreen1
mow2
longarm82_4

We were able to pave all the roads shown below so far this budget year


 
 

​Nean Ln
IMG_3539
IMG_3541
Jolly Ln​
IMG_3556
IMG_3558
East Millers Cove
IMG_3552
IMG_3554
IMG_3555
IMG_3824
IMG_3826
IMG_3830
Pickens Gap
IMG_3780
IMG_3784
IMG_3927
IMG_3926
I.C. King
IMG_3773
IMG_3917
IMG_3779
IMG_3924
Hinkle
IMG_3792
IMG_3903
IMG_3794
IMG_3904
Peppermint
IMG_2292
IMG_2300
Green
IMG_2535
IMG_2536
IMG_2481
IMG_2546
IMG_2483
IMG_2551
Delozier
IMG_2543
IMG_2544
Carpenters Campground
IMG_2231
IMG_2236
IMG_2750
IMG_2752